Abstract: This paper introduces the importance of process treatment facility in LNG terminal. The key equipments in BOG re-condensation process and the principles and precautions of plot plan of process treatment facilities are introduced. This article briefly describes the general principles of pipe rack piping layout, and focuses on the particularity of low-temperature piping from the aspects of π type compensator layout, limited support setting, thermal bowing effect, water hammer load and so on. During the selection of piping material, piping layout, stress analysis and construction inspection, the impact of low-temperature medium design conditions on the whole piping design shall be fully considered to ensure the quality and safety of engineering design. This paper introduces the piping layout of thermal safety valve and the setting of piping reserved interface, and puts forward some precautions for piping design conditions dilivery to civil.
Key words: process treatment facility, BOG re-condensation process, piping design, plot plan
摘要: 介绍了工艺处理设施在接收站中的重要性、BOG蒸发气再冷凝工艺关键设备以及工艺处理设施平面布置的原则和注意事项。简述了管廊管道布置的一般原则,从π型补偿器的布置、限位支架的设置、冷拱效应、水锤荷载等几个方面着重论述了低温管道的特殊性。在进行管道材料选择、管道布置、应力分析及施工检验时,均应充分考虑低温介质设计条件对整个管道设计的影响,以保证工程设计的质量和安全。介绍了热力安全阀的管道布置及管道预留接口的设置,并对专业委托条件提出一些注意事项。
关键词: 工艺处理设施, BOG再冷凝工艺, 管道设计, 平面布置
Li Yongjin, Qi Yifang. Key points of piping design for pipe rack of process treatment facility in LNG terminal[J]. Petroleum Refinery Engineering, 2022, 52(1): 44-48.
李永进, 齐一芳. LNG接收站工艺处理设施管廊管道设计要点[J]. 炼油技术与工程, 2022, 52(1): 44-48.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://journal01.magtechjournal.com/lyjsygc/EN/
https://journal01.magtechjournal.com/lyjsygc/EN/Y2022/V52/I1/44
[1]金光,李亚军.LNG接收站蒸发气体处理工艺[J].低温工程,2011(1):51-56.
[2]李永进.LNG气化器平面布置及其管道设计[J].炼油技术与工程,2014,44(3):36-39.
[3]张大船.液化天然气接收站低温管道材料设计[J].炼油技术与工程,2016,46(6):35-38.
[4]曹学文,吉俊毅,杨文.LNG卸料管道氮气预冷温度分布规律[J].油气储运,2016,35(5):492-497.
[5]任伟.LNG接收站管道应力分析综述[J].山东化工,2017,46(1):82-83.